Maintaining excellent savings with Layher Time and manpower savings of some 50% compared with conventional tube and fitting scaffold, and the ability to maintain open access roads have been key advantages arising from the use of Layher scaffolding at E.ON UK power...
Layher on line with SHS Group Refurbishment of a major National Grid overhead line facility has gained from the combination of SHS Group experience and Layher equipment. The installation of 11 scaffold towers and protective netting at Thickthorn Services on the...
Layher’s Allround Bridging System saves time and costs in London Installed by Pro Access Scaffolding, the purpose-designed Layher Allround® Bridging Truss system has produced tangible benefits alongside the busy A406 North Circular Road in London with ease of...
Helping meet vital access needs at historic site Key design features of Layher scaffolding have played a significant role during refurbishment work at the Queen’s Chapel of The Savoy in London. “C Ansell & Sons – working for the client, The Duchy of Lancaster –...
Key advantages for jetty maintenance at Sullom Voe Terminal The lightweight design and versatility of Layher Allround® scaffolding has made a significant contribution to the ongoing maintenance at the Sullom Voe oil terminal in Shetland – a key BP facility. Undertaken...
Scaffolding should always be erected by trained and qualified operatives following approved procedures. For technical advice and design support contact Layher Technical Department on 01462 475100.