Layher’s FlexBeam system has been utilised on a major maintenance scheme on the iconic Forth Road Bridge. The project was to remove, repair, and re-fit inspection walkways under the bridge in 120m sections at a time. A temporary fully suspended scaffold deck was...
Scaffolding should always be erected by trained and qualified operatives following approved procedures. For technical advice and design support contact Layher Technical Department on 01462 475100.